Cranberry Township has begun looking for bids for phase two of the Glen Eden Watershed Stream Restoration Project.
Phase two of the project looks to improve waterways in the township. The project will include streambank slope adjustments, floodplain connectivity, toe wood structures, rock cross vanes, converging rock clusters, sawtooth deflectors, planting, erosion & sedimentation control features.
Cranberry Township uses the electronic bid management platform PennBid to provide additional information and collect contract documents.
The post Glen Eden Watershed To Undergo Repairs appeared first on ButlerRadio.com – Butler, PA.